Project Description
HANSON VICTORIA DEEPWATER TERMINAL, GREENWICH
| PROJECT DESCRIPTION |
The Victoria Deep Water Terminal on the Thames at Greenwich development including upgrade and improve the site. The Victoria Deep Water Terminal on the north-west side of the Greenwich peninsula off Tunnel Avenue is an important strategic site, which is safeguarded as an industrial wharf in the London plan and the Greenwich local plan.
The proposals include replacing two existing concrete batching plants with three new ones enclosed within a new building. Raw materials for concrete production, principally sand and gravel, which is currently stored in open bays, will also be kept in the building.
PROJECT DETAILS
CLIENT
Hanson
Services
Hydrology, Flood Risk Assessment, Concept Drainage Design
Sector
Industrial
Value
£12m
Location
Mansfield